News

Home       News


News

The factory is full of waste materials, but the boss is still using manual labor to "shred" them? In just one minute, you'll understand how a shredder can save you three workers and avoid a 50,000 yua

Don't wait until the environmental protection inspection arrives before regretting it! - Iron drums, plastics, ton bags, furniture... all "swallowed up in one go". The discharge size is 5cm, and the storage capacity is 80% after compression. - Quick blade replacement in 15 seconds, explosion-proof and dust-proof throughout the machine, with dual CE/Chinese standard certifications and no pressure in passing the environmental assessment. - Actual test results: Processing capacity per shift - 3 workers in 8 hours, with electricity costs of just 18 yuan, directly saving the cost of the machine within a year. - Order now and get free trial blades with a 2-year warranty and environmental declaration templates, limited to the first 20 units! Click "Shred Now" to turn waste into raw materials and stop letting profits be "ripped away"!

CATEGORIES

CONTACT US

Contact: Claude Xia

Phone: 86-17746684742

Tel:86-0797-8587898

Email: [email protected]

Add: No.15, Industrial Avenue, Industrial Park, Shicheng County, Ganzhou City, Jiangxi Province

Leave a message

Facebook

LinkedIn

Youtube

whatsapp

[email protected]

Top